Sunday, 24 June 2007

15th Weekend

Well it's been a while, but progress has been good. Since the last blog:

Double glazing installed
Kitchen installed
Bathroom fitted
Bedroom 1 almost complete
Bedroom 2 almost complete
Bedroom 3 almost complete
Upstairs radiators fitted
Water connected to all taps
Staircase and landing 1st coat of paint
Woodburner flue installed
New door lining to bedroom 1.

Pictures at: http://photosbytony.fotopic.net/c1295061.html and http://photosbytony.fotopic.net/c1311410.html

Sunday, 29 April 2007

7th Weekend

Photo's here: http://photosbytony.fotopic.net/c1267430.html

In addition to photo's:

Bedroom 1 prepared for painting
Bathroom floor replaced
Waste pipes cemented in
Ground floor walls prepared and sealed for plastering
Doorway between lounge/hallway formed
All ceilings plastered
All rooms cleared and swept.

6th Weekend

Updated photo's here: http://photosbytony.fotopic.net/c1262300.html

In addition to photo's, the new soil and vent pipe was installed.

Sunday, 15 April 2007

5th weekend

A lot of progress this weekend with the help of Simon on Saturday and Matt on Sunday:

Fireplace completed (Simon)
All chases plastered (Matt)
Soil & vent pipe removed
Boiler installed
Flue installed through roof
Lounge prepared for plastering
1st floor ceilings PVA'd
1st Floor floorboards replaced
TV aerial diverted into loft
Front external socket installed
Front lawn mown!

As soon as the upstairs ceilings are completed this week, redecoration can start :)

Photos at: http://photosbytony.fotopic.net

Monday, 9 April 2007

4th (Easter) Weekend

With four days available a fair amount was achieved:

central heating pipework completed
all remaining chases filled
fireplace opened out
2 visits to the tip
bathroom floor lifted
gas pipework installed
loft boarded
upstairs lighting wired.

Wednesday, 4 April 2007

Mid 3rd week work

I was kindly assisted by Simon and Matt tonight and we go loads done. Simon filled almost all the downstairs chases whilst Matt and I wired all the TV points, telephones and cat5e network. We also installed our first few central heating pipes and had a general clear up.

Weekend 3

On Saturday I was kindly assisted by Simon who prepared and fixed all the electrical boxes on the ground floor - a major step forward. I also prepared and fixed back all the boxes upstairs as well.