Wednesday 4 April 2007

Weekend 3

On Saturday I was kindly assisted by Simon who prepared and fixed all the electrical boxes on the ground floor - a major step forward. I also prepared and fixed back all the boxes upstairs as well.

On Sunday I had the help of both Matt and Martin. We installed all of the conduits, and I drilled all of the joists ready for the cabling and pipes. We wired the ring main for the main house and the ground floor lighting circuit. Most of the ground floor conduits were fixed back ready for filling.